1008.01 Contamination Sources

Under Construction

Under Construction

The content on this page is under construction and may be out of date.

Friday, August 11, 2023

CONTAMINATION SOURCES FOR WELLS

 

The intent of this Policy is to establish control over the location of future potential sources of contamination in and around the school and it's water system so as to prevent or minimize any hazard to the safety of the school's drinking water.

 

For the purpose of this policy, "Water Well" shall mean any excavation that is drilled, corralled, bored, washed, dug, driven, jetted, or otherwise constructed for the purposes of the exploring for ground water, monitoring ground water, utilizing the geothermal properties of the ground or extracting water from or injection of water into the underground water. The water well shall not include any excavation made for obtaining or prospecting for oils, natural gas, minerals or products mined or quarried or inserting media to repressure oil or natural gas bearing formation.

 

The school staff and board shall make every effort to prevent the placement, maintenance, construction, or replacement of any of the following structures or the conducting of any of the following activities within the distance specified below from any existing public water supply well, water storage tank, or water treatment facility.

 

CATEGORY                                                   DISTANCE

 

Sewage Lagoon                                              1,000 feet

Water Well                                                     1,000 feet

Cesspool                                                            500 feet

Dump                                                                 500 feet

Feedlot or Feedlot Runoff                                 500 feet

Corral                                                                 500 feet